Can I start before I have every answer?
Yes. Start with facts you already know and return to the missing details when the responsible team has checked them. Keep unknown information separate from a confirmed “no”. A missing sensitivity assessment does not mean the product is insensitive, just as an unconfirmed route does not mean there is no climatic exposure. The purpose of the review is to make those gaps visible before the supplier uses the qualification as a design basis.
How do anonymous progress and account access differ?
An anonymous start saves the work on the server with the current browser context. It should not be treated as reliable cross-device access. Saving an email associates the current work with an account without requiring an OTP first. Opening existing profile information requires login. The primary login method is a six-digit email code. Keep that code private; saving an email and proving access to an account serve different purposes.
What does the qualification document establish?
The document organises captured requirements, quantities, route, protection decisions and technical considerations for a supplier conversation. It needs a project name and description before generation. Where information is incomplete, clarification is still needed; downloading a PDF does not remove that responsibility. The public example shows the same document pipeline with demonstration data. Product images improve interpretation, while an explicit confidentiality exception records why images are withheld.